Goldsmith Gulch - Orchard at Silo Park

Project Status: Design

The design is being performed in partnership with the Urban Drainage and Flood Control District. The project team is evaluating concepts for pedestrian connectivity underneath Orchard Road. Construction is planned for 2020.

Updated: 

September 2018

Project Description: 

The project includes the replacement of the existing culvert with a larger structure to reduce the potential for overtopping of Orchard Road in a 100-year event.

Project Manager: 

Wanda DeVargas