Building Permit Fee Schedule
Permit Fees
Value (Contract Price) | Fee |
---|---|
$1 to $500 | $0 |
$501 to $2,000 | $23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 |
$2,001 to $25,000 | $69.25 for the first $2,000, plus $14 for each additional $1,000 or fraction thereof, to and including $25,000 |
$25,001 to $50,000 | $391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000 |
$50,001 to $100,000 | $643.75 for the first $50,000, plus $7 for each additional $1,000 or fraction thereof, to and including $100,000 |
$100,001 to $500,000 | $993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000 |
$500,001 to $1,000,000 | $3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000 |
$1,000,001 and up | $5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof. |
Please add to the cost of the Permit Fee Plan Review Fee 65% of the Building Permit Fee.
- Use Tax = [(contract price x 60%) - $3,500] x 3% (if applicable)
- Arapahoe County Open Space Sales and Use Tax = [(contract price x 60%) - $3,500] x 0.25% (If applicable)
- Total cost of permit = permit fee + plan review fee + use tax + Arapahoe County Open Space and Use Tax
- All permits with a contract price in excess of $5,833 will have use tax and Arapahoe County Open Space Sales and Use Tax assessed (exception: demolition permits)
Other Inspection Fees | |
---|---|
1.) Inspection outside of normal business hours (minimum charge - two hours) | $47 per hour* |
2.) Inspection for which no fee is specifically indicated | $47 per hour* |
3.) Additional plan review required for changes, additions, or revisions to plans | $47 per hour* |
4.) For use of outside consultants for plan checking and inspections, or both | Actual Cost** |
*Or the total hourly cost to the jurisdiction, whichever is the greatest. The cost shall include supervision, overhead, equipment hourly wages and fringe benefits of the employees involved. ** Actual costs include administrative and overhead costs.
Electrical Permit Fees
Inspections and Fees for Elevators |
---|
Safety Test Witnessing for Hydraulic Elevators $200 |
Safety Test Witnessing for Traction Elevators $500 |
Elevator Conveyance Fee and Administrative Cost $255 |
Inspections outside normal business hours (min. 2 hours) $ 47 per hour |
Inspections for which no fee is specifically indicated $ 47 per hour |
Addt'l Plan review required for changes, additions or revisions to approved plans $ 47 per hour |
Re-inspection fee $ 47 per hour per inspection |
For use of outside consultants for plan checking/inspections or both |
*Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. |
Actual Costs ****Actual costs include administrative and overhead costs. |